成人精品一区二区三区-成人精品一区二区久久久-成人精品一区二区久久-成人精品一区二区激情-成人精品一区二区不卡视频-成人精品一区二区www

1650503743975309.jpeg

Paper Feeder Configuration

Company Name

 

Contact

 

Contact Number

 

Material maximum format (width & length)

 

Minimum material width (width & length)

 

Material Thickness Range

 

Material

Cardboard □Thin paper □Grey board □Corrugated □Plastic sheet □Other

Remark:

Conveying speed (sheets/hour or m/min)

 

Feeder requirements

□Aberration correction

□ Manual up and down □ Manual front and rear □ Manual left and right

□Automatic up and down □Automatic front and rear

Remark:


Paper table correction

□Manual correction □Automatic correction □No correction

Remark:

Side stop

□ Manual adjustment of the top side stop □ Manual adjustment of the full length side stop

□Automatic adjustment of top side stop

Remark:

Double sheet detection

□ Required □ Not required

Remark:

Paper feed table

Paper belt: □ Ordinary paper belt □ Negative pressure paper belt

Angle: □ Horizontal □ Inclination □ Change with the host

Paper table support: □Gas spring □Fixed

Remark:

Press box

□Manual □Quick adjustment □Automatic

Remark:

Foreign body detection

□Need □No need to intercept foreign objects

Remark:

Side gauge

□Required □Not required □Requires operation side □Requires transmission side

Remark:

Pre-rule

□ Required □ Not required

Remark:

Non-stop refilling

□ Required □ Not required

Remark:

Pre-stacked paper

□Outside the machine door □The machine moves the door □The machine opens the door No need

Remark:

Power and Paper Step

Power source:

□From the host □Independent motor

Remark:

Main engine power output direction:

□Same direction as conveying direction □Reverse conveying direction □Refer to drawing

Remark:

The power connection method of the two machines:

□Chain □Timing belt □Shaft drive □Leave the shaft head

Remark:

Paper Step:

□Constant □Stepless adjustment □Single overlapping two steps

Remark:

Clutch

□Electromagnetic clutch □Pneumatic clutch

No clutch required

Remark:

Before the paper arrives, it is adjusted in the morning and evening

□Manual □Automatic □Not required

Remark:

Auxiliary configuration

□Static eliminator □Ion blower □Anti-floating cable

Remark:

Cover

□ Required □ Not required

Remark:

Electrical requirements

□Leave the position for installing the switch (except the necessary switch)

□ Just install the switch □ Install the switch and lead the line into the junction box

Leaving the motor installation position to provide the motor

Remark:

Air requirements


(Vacuum pumps, blowers, and air compressors should be equipped by the user and informed of the necessary data related to Jucheng)


□Vacuum pump is turned on at a fixed point □Negative pressure solenoid valve

Side blower connected to vacuum pump

Side blower with separate blower

Side blowing with separate compressed air

Remark:

Feeder Color

 

Other needs



主站蜘蛛池模板: 亚洲欧美日本在线| 91在线欧美| 久久亚洲国产中v天仙www| 亚洲a网| 国产日韩欧美在线一区二区三区| 日本作爱视频| 99视频在线精品| 免费在线黄| 一级毛片黄片| 精品国产人成亚洲区| 台湾在线视频| 国产福利91精品一区二区| 青青国产视频| 91综合网| 六月婷婷开开放处| 亚洲区一区| 狠狠色丁香| 四虎永久在线精品视频播放| 国产高清在线看| 日本精a在线观看| 99热91| 男人午夜天堂| 在线观看麻豆国产精品| 久久996re热这里只有精品| 香蕉视频在线观看网站| 国产女人好紧好爽| 日韩视频二区| 成人黄激情免费视频| 欧美视频在线播放| 69综合网| 免费爱爱app不收费| 一级毛片成人免费看免费不卡| 精品亚洲永久免费精品| 香蕉视频h| 国产网爆门| 视频一区二区三区欧美日韩 | 久久国产高清一区二区三区| 亚欧在线视频| 国产一级片播放| 手机在线色视频| 国产激情久久久久久影院|